North and South Abutment Reconstruction Bid
40 HARBOR DRIVEMOUNT DESERT, NORTHEAST HARBOR, 04662
North and South Abutment Reconstruction (additional links are below)_
Sealed bids for the North and South Abutment Reconstruction project will be received by the Town
of Mount Desert, Town Office at 21 Sea Street, Northeast Harbor, ME 04662 until 2:00 P.M., local
time, December 17ᵗʰ 2021 and at that time and place publicly opened and read. The lowest
responsive bidder must demonstrate successful completion of projects of similar size and
scope to be considered for the award of this contract. The Town of Mount Desert reserves the right
to reject any or all bids received.
Bid Documents and Drawings developed by G.F. Johnston and Associates Consulting Civil Engineers can
be viewed at the Town of Mount Desert Harbor Masters office and online at the Towns Website Tuesday
November 2ⁿᵈ, 2021.
Project Description:
The work is the demolition and removal of the concrete base and cantilevered abutments for the
marina and public float in Town of Mount Desert, Northeast Harbor. The Marina abutment is the North
abutment, and the South abutment is the Public float access. The project requires one ramp and
abutment always remain operational. Laydown space is available onsite, coordinated with Harbor
Master. The project will require demolition of the cantilevered concrete structures,
excavation, preparation of base, casting a leveling nd constructing a reinforced granite
abutment with railings. The project is planned to Start March 15th of 2022.
Newspaper Ad- Wharf Abutment Bid
BIDDING AND CONTRACT REQUIREMENTS AND SPECIFICATIONS: for the North and South Abutment Reconstruction
Bid Plan Package
Addendum #1
Pre-Bid RF1 Resp REV - December 9th, 2021